- Joined
- Mar 15, 2003
- Messages
- 6,635
M.V. said:I had no clue what you said xD. But can you explain the way to avoid using an overflow box I didnt quite catch, and as for the holes I meant on the tank where should they go!?
hmmm...this is where it gets tough without 3-d mapping...hey Tony, can you jump up the bandwidth????
I usually drill through the bottom of the tank, two holes, about 6 inches in from each side, and 3-4 inches from the back. Make sure that this coordinates with your stand first though !! (don't want piping where there are braces, etc.)
Alternatively, you can put the holes on the rear side of the tank too, as long as you have room to run the pipes between the tank and the wall.
There really are a lot of options!
hope this helps....greg